Shower Room Installation Process 2

Sep 29, 2017 Leave a message

7. installation of aluminum (important): in the hole in the rubber, screw the aluminum lock on the wall. Attention should be adjusted while installing to keep the verticality of the aluminum material.

8. fixed glass (important link): the glass clip is locked at the bottom of the drill hole, flat glass or bent glass fall into the glass clip slot, and slowly push into the wall material. Screw again.

9. installation of pipe jacking: find the corresponding position above the fixed glass, drill holes, install (straight mouth / oblique mouth) fixed seat, and connect the pipe jacking. Fix it at the top of the glass with the elbow sleeve.

10. install the shelf: check the position, install the shelf, tighten the nut of the plywood, fix the laminated glass, keep the vertical and horizontal. Pay attention to the waterproof of the fixed glass aluminum material.

11. installation of doors (an important part): general door glass has been set aside to install the wheel hole. The door needs a mobile pulley, the first installation of two wheels on the top of the sliding door, the wheel with, placed in the corresponding position, and then install the wheels below. Hardware installed door hinges, will be installed on the fixed door reserved hole. After installing, adjust the core position of the lotus leaf, to close the door, feel the best.

12., do a good job of waterproof (important links): in accordance with the requirements of the glass in the side or under the installation of a suction bar or bar bar. Use the silica gel to sew the aluminum and the wall, the glass and the bottom joint seam to sew tightly. After the basic installation of shower room is finished, glass glue is applied to the aluminum frame and wall, which can effectively prevent future flooding.

13., debugging and fastening (important links): check whether the parts are comfortable and smooth, and find out the problems should be adjusted in time. After adjusting, tighten the corresponding screws, so that the whole shower room is more solid.

14., finishing work: at this point, shower room installation has been completed, and finally is the finishing work. Wipe the whole shower room with a cloth, etc., and install the tools, spare parts and so on, and pay attention to the finished product protection.