1. Shower tray installation
Regular shower room manufacturers will send professional staff to do the installation, installation must be careful, water test is an essential part. If the glass party is well installed, it will be difficult to make larger changes.
2. Ready to install
See if the product packaging is complete, and check whether the configuration is complete after opening. Prepare the necessary tools to put together so that you can take them easily.
Material preparation: shower room is equipped with materials such as bezel, toughened glass, handle and pulley.
Tool preparation: a lot of tools are needed during the installation of the shower room. These tools are best prepared before installation. The installation of the tool used is a pencil, tape, hammer, impact drill, electric screwdriver, glue gun, manual screwdriver, pliers etc..
3. install the shower tray: combine the shower tray parts, adjust the level of the tray, ensure the basin and the pelvic floor no water. The hose can be extended with distance, and the pelvic floor and the floor drain are firmly connected.
4. test and protection (important link): after installing, you need to test the water to ensure that the water is unimpeded. In the room before installation, but also to the already installed tray timely protection.
5. Room installation: Shower room safe or not has an important relationship with housing installation. Whether or not to find the hole is accurate, whether the fittings are properly installed, whether the waterproof seal is good or not will affect the normal use of the product. The intensity and angle of installation are also difficult to grasp by ordinary people.
6. Find a punch: clear bathroom exhaust pipe, to prevent drilling pipeline. Use a pencil and a horizontal ruler to determine the drilling position of the aluminum material against the wall and punch with percussion drilling.



















